The On Deck Channelvideo

Boatyard Experts Turn It Up This Week | Ep. 8

22 luglio 2023 · 19 min · 283 visualizzazioni · St. Petersburg

Cosa tratta questo video

The Yacht Rigger facility in Saint Petersburg, Florida, performs various marine upgrades and repairs, including the installation of a custom hardtop on a Swift trawler.13:57 Technicians align the hardtop using a temporary 2x4 support structure, sealing the aluminum-to-stainless steel connections with CT1 adhesive and Tefgel to prevent galvanic corrosion.15:22 The team also prepares a rowboat for four marine biologists planning an Atlantic crossing, replacing lifelines, jack lines, and electrical components while optimizing solar panel placement.9:19

Technical maintenance procedures include replacing a cutlass bearing by using a heavy-duty aluminum drift to press the old unit from the strut.12:37 When installing a new bearing, technicians drill a dimple for the set screw and orient the bearing so a flat surface, rather than a water groove, sits at the 6 o'clock position to prevent premature wear.13:25 Additionally, the shop demonstrates "inverending" a halyard by whipping a Flemish loop onto a new line and pulling it through the mast using the old line as a chase.5:03

Guarda su YouTube

Altro da The On Deck Channel

24 shipping containers. A lot more than rigging!ago 2026Moving from a Full Size Kitchen to a Boat Kitchen | New to Boat Life Seriesago 2026Quick Overview of Marine Heads on Aluminum Boats | New to Boat Life Seriesago 2026How to Install the ARCO Zeus Omega Alternator Regulator | How the Pros Do It Seriesago 2026

Da The On Deck Channel — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema