The On Deck Channelvídeo

Boatyard Experts Turn It Up This Week | Ep. 8

22 de julho de 2023 · 19 min · 283 visualizações · St. Petersburg

O que este vídeo aborda

The Yacht Rigger facility in Saint Petersburg, Florida, performs various marine upgrades and repairs, including the installation of a custom hardtop on a Swift trawler.13:57 Technicians align the hardtop using a temporary 2x4 support structure, sealing the aluminum-to-stainless steel connections with CT1 adhesive and Tefgel to prevent galvanic corrosion.15:22 The team also prepares a rowboat for four marine biologists planning an Atlantic crossing, replacing lifelines, jack lines, and electrical components while optimizing solar panel placement.9:19

Technical maintenance procedures include replacing a cutlass bearing by using a heavy-duty aluminum drift to press the old unit from the strut.12:37 When installing a new bearing, technicians drill a dimple for the set screw and orient the bearing so a flat surface, rather than a water groove, sits at the 6 o'clock position to prevent premature wear.13:25 Additionally, the shop demonstrates "inverending" a halyard by whipping a Flemish loop onto a new line and pulling it through the mast using the old line as a chase.5:03

Ver no YouTube

Mais de The On Deck Channel

24 shipping containers. A lot more than rigging!08/2026Moving from a Full Size Kitchen to a Boat Kitchen | New to Boat Life Series08/2026Quick Overview of Marine Heads on Aluminum Boats | New to Boat Life Series08/2026How to Install the ARCO Zeus Omega Alternator Regulator | How the Pros Do It Series08/2026

De The On Deck Channel — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema