Acorn To Arabellavideo

Boat Work: Roller Furler and Lazy Jacks - Episode 279 - Acorn to Arabella: Journey of a Wooden Boat

1 settembre 2023 · 24 min · 81K visualizzazioni · Portland, Maine

Cosa tratta questo video

Steve installs lazy jacks on the main and mizzen masts of the wooden boat *Arabella* to improve sail handling and containment.2:43 He constructs the lazy jack hardware using stainless steel chain links cut to size to avoid the cost of individual rings, and secures the lines to the masts using Dyneema slings.9:06 To prevent the lazy jack lines from snagging on the gaff, he uses an oscillating multi-tool to chamfer and reshape the wooden chocks on the spars.7:25 Additionally, Steve and Scott fabricate and install winch bases for the jib using cherry wood blanks, which they process in a local Portland shop before bedding and bolting them to the coamings.13:21 The team also assembles and installs a jib roller furler, cutting the foils to length and using Loctite and 5200 sealant to secure the connectors.18:13 After finalizing the furler drum adjustment and sail feeder, they successfully set the jib.19:21

Guarda su YouTube

Altro da Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... Againott 2026Saying Goodbye to Newfoundland—and the Man Who Inspired Arabellaset 2026Upgrading the Rudder and Another Trek To The Cliffago 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coastlug 2026

Da Acorn To Arabella — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema