Acorn To Arabellavídeo

Boat Work: Roller Furler and Lazy Jacks - Episode 279 - Acorn to Arabella: Journey of a Wooden Boat

1 de setembro de 2023 · 24 min · 81K visualizações · Portland, Maine

O que este vídeo aborda

Steve installs lazy jacks on the main and mizzen masts of the wooden boat *Arabella* to improve sail handling and containment.2:43 He constructs the lazy jack hardware using stainless steel chain links cut to size to avoid the cost of individual rings, and secures the lines to the masts using Dyneema slings.9:06 To prevent the lazy jack lines from snagging on the gaff, he uses an oscillating multi-tool to chamfer and reshape the wooden chocks on the spars.7:25 Additionally, Steve and Scott fabricate and install winch bases for the jib using cherry wood blanks, which they process in a local Portland shop before bedding and bolting them to the coamings.13:21 The team also assembles and installs a jib roller furler, cutting the foils to length and using Loctite and 5200 sealant to secure the connectors.18:13 After finalizing the furler drum adjustment and sail feeder, they successfully set the jib.19:21

Ver no YouTube

Mais de Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... Again10/2026Saying Goodbye to Newfoundland—and the Man Who Inspired Arabella09/2026Upgrading the Rudder and Another Trek To The Cliff08/2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coast07/2026

De Acorn To Arabella — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema