Wildling Sailingvideo
I Did a Rub Rail
19 aprile 2024 · 21 min · 91K visualizzazioni
Cosa tratta questo video
Arthur repairs the toe rail on a 42-foot plywood and epoxy catamaran purchased for 2,000 euros.0:28 After discovering rot beneath the rail, he routes the edges of new lashing blocks to ensure a flush fit against the hull.2:26 He fills screw holes and voids with thickened epoxy, using piping bags to ensure complete penetration and prevent air bubbles.4:08 He dry-fits the rail with three screws before marking and pre-drilling 5.5mm clearance holes for 5mm screws.12:18 The final installation requires shaping the forward section of the rail and applying a heavy bead of Sikaflex to the mating surfaces.14:38 Intermittent rain delays the final sealing, forcing him to waterproof the work area temporarily.16:09 Additionally, he attempts to service the engine lower unit but discovers the necessary gaskets are missing from his existing service kit, requiring a new parts order.17:43 He plans to finish sanding and doweling the rail once weather conditions improve.20:51
Altro da Wildling Sailing
Da Wildling Sailing — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



