Sven Yrvindvideo
11 Nov 2025 Ladder stop and pad eye
10 novembre 2025 · 2 min · 4K visualizzazioni
Sven secures pad eye with clamps on boat hull
Cosa tratta questo video
Sven Yrvind installs a pad eye on his boat using epoxy and temporary screws to hold the hardware in position during the curing process.▶ 0:04 To prevent the screws from bonding permanently to the epoxy, he heats them before removal.▶ 0:25 He reinforces the installation by layering fiberglass around the base of the pad eye.▶ 1:06 While acknowledging concerns regarding the structural integrity of drilling multiple holes in a hull, he proceeds with the installation to ensure the mount remains secure.▶ 0:38 After the initial epoxy cure, he applies additional fiberglass reinforcement to the surrounding area to increase the strength of the attachment point.▶ 1:06 The process concludes with the application of speed ply over the fiberglass, ensuring the final assembly is robust enough for its intended use.▶ 1:48
Altro da Sven Yrvind
Da Sven Yrvind — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



