RAN Sailingvideo
Keel Area Reinforcement - 18 Layers Of Fiberglass In One Go - Ep. 410 RAN Sailing
20 settembre 2024 · 20 min · 110K visualizzazioni · Skåne
Cosa tratta questo video
Johan and Malin reinforce the keel pocket of their boat hull by laminating 18 layers of 600g Bi-AX fiberglass in a single wet-on-wet session.6:27 The process increases the solid laminate thickness from 8mm to over 25mm to ensure structural integrity at the keel connection.6:35 Johan cuts the fiberglass into four varying widths to prevent hard spots at the edges, staggering the pieces to avoid stacking seams.10:21 The project requires 47 kilograms of glass and approximately 43 kilograms of epoxy.7:19 Because dropping temperatures thickened the epoxy during the late-night application, Johan uses a vacuum bag to ensure full saturation and eliminate air bubbles in the final two layers.15:34 A future keel grid will be installed over this reinforced area to further distribute structural loads.15:54 Outside of the boat project, the pair manages home renovations, including the installation of new clay roof tiles on their 1860s Skånelänga house and the removal of redundant concrete entrance stairs.17:30
Altro da RAN Sailing
Da RAN Sailing — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



