How To Replace Rigging & Emergency OFFSHORE Repairs
30 maggio 2026 · 5 min · 784 visualizzazioni · Unorganized Borough, United States
Climber secures rigging at mast base, glacier behind
Cosa tratta questo video
A Westerly Yachts Ltd. Discus 33 discovered a frayed shroud 1,000 miles into a 2,500-mile passage from Hawaii to Alaska.Watch After enduring a gale, the crew rigged a spare piece of running rigging through the mast as a temporary splint to stabilize the compromised stay.0:28 They sailed conservatively for two weeks to reach Reed Inlet, where they replaced the damaged shroud with a spare.0:36 During the replacement process, the crew noted that removing the lower stay caused the mast to lose column and bow significantly, highlighting the structural importance of the lower rigging.2:24 After installing the replacement, the crew tensioned the shroud by sailing to windward on a starboard tack, adjusting the tension on the leeward side to ensure the mast remained straight.4:24 The process required multiple tacks and incremental adjustments to eliminate slack and restore proper mast alignment.4:55
Barche in questo video
Altro da Sailing Sea Dream of Clyde
Da Sailing Sea Dream of Clyde — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



