Sailing Good, Bad, and Uglyvideo

BIG SPLURGE IS IT WORTH IT?!

27 settembre 2026 · 22 min · 46K visualizzazioni · Florida

Cosa tratta questo video

Matt installs a custom arched steel French door from Pinky's into a residential interior wall as part of an ongoing home renovation.0:48 To accommodate the arched frame within a square opening, he constructs a custom frame using 2x4 lumber and flexible drywall, employing a scoring technique to achieve the necessary curve.6:27 The installation requires precise framing with a half-inch clearance on each side for shims.5:22 After framing, he applies 90-minute setting-type joint compound to the drywall seams and corner beads.17:01 The project also includes the installation of a Waterdrop C2SL countertop water filtration system.4:02 The crew notes that their sailboat, Good, Bad, and Ugly, remains for sale and they are open to negotiations on the price.22:18

Guarda su YouTube

Altro da Sailing Good, Bad, and Ugly

Infested, Moldy Disaster to Dream Transformation Start to Finishset 2026IT’S FINALLY DONE!set 2026We Needed a Win and This Wasn’t Itago 2026The End Is Finally Nearago 2026

Da Sailing Good, Bad, and Ugly — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema