Sailing Good, Bad, and Uglyvidéo

BIG SPLURGE IS IT WORTH IT?!

27 septembre 2026 · 22 min · 46K vues · Florida

Ce que couvre cette vidéo

Matt installs a custom arched steel French door from Pinky's into a residential interior wall as part of an ongoing home renovation.0:48 To accommodate the arched frame within a square opening, he constructs a custom frame using 2x4 lumber and flexible drywall, employing a scoring technique to achieve the necessary curve.6:27 The installation requires precise framing with a half-inch clearance on each side for shims.5:22 After framing, he applies 90-minute setting-type joint compound to the drywall seams and corner beads.17:01 The project also includes the installation of a Waterdrop C2SL countertop water filtration system.4:02 The crew notes that their sailboat, Good, Bad, and Ugly, remains for sale and they are open to negotiations on the price.22:18

Regarder sur YouTube

Plus de vidéos de Sailing Good, Bad, and Ugly

Infested, Moldy Disaster to Dream Transformation Start to Finishsept. 2026IT’S FINALLY DONE!sept. 2026We Needed a Win and This Wasn’t Itaoût 2026The End Is Finally Nearaoût 2026

De Sailing Good, Bad, and Ugly — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème