Wildling Sailingvideo
A HUGE Step Towards Going Back in The Water (In 2 weeks) | Wildling Sailing
18 agosto 2023 · 24 min · 133K visualizzazioni
Cosa tratta questo video
Refitting a 42-ft Wharram Pahi catamaran requires extensive hull preparation and painting before the scheduled relaunch. The owner applies two coats of blue primer to the hulls, sanding with 180-grit sandpaper between layers to remove debris and surface imperfections.3:31 To ensure proper adhesion for the final topcoat, the crew cleans the hulls with a weak ammonia solution to remove residual grease and sanding dust.14:07 The painting process utilizes a roll-and-tip technique, which involves applying paint with a roller and smoothing the finish with a brush.14:15 The project relies on volunteer labor coordinated through the Workaway platform, with helpers assisting in sanding, cleaning, and painting tasks.11:06 Total material costs for paint, rollers, and brushes reach 680 euros.15:40 The final plan includes applying a turquoise topcoat and yellow paint to the decks before the vessel returns to the water.12:18
Altro da Wildling Sailing
Da Wildling Sailing — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



