Wildling Sailingvídeo

A HUGE Step Towards Going Back in The Water (In 2 weeks) | Wildling Sailing

18 de agosto de 2023 · 24 min · 133K visitas

Qué cubre este vídeo

Refitting a 42-ft Wharram Pahi catamaran requires extensive hull preparation and painting before the scheduled relaunch. The owner applies two coats of blue primer to the hulls, sanding with 180-grit sandpaper between layers to remove debris and surface imperfections.3:31 To ensure proper adhesion for the final topcoat, the crew cleans the hulls with a weak ammonia solution to remove residual grease and sanding dust.14:07 The painting process utilizes a roll-and-tip technique, which involves applying paint with a roller and smoothing the finish with a brush.14:15 The project relies on volunteer labor coordinated through the Workaway platform, with helpers assisting in sanding, cleaning, and painting tasks.11:06 Total material costs for paint, rollers, and brushes reach 680 euros.15:40 The final plan includes applying a turquoise topcoat and yellow paint to the decks before the vessel returns to the water.12:18

Ver en YouTube

Más de Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran Refitoct 2026I Lifted Her Out For a Very Important Rebuild.sept 2026One Final Refit Before Crossing The Atlantic.ago 20262 Days Alone at Sea On my Primitive Double-Canoe.ago 2026

De Wildling Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema