MJ Sailingvideo
Seeing ALL Of Our Catamaran For The FIRST TIME!! (MJ Sailing - Ep 340)
31 agosto 2024 · 18 min · 158K visualizzazioni · Kent Island
Cosa tratta questo video
A catamaran undergoes a transition from a long-term indoor storage tent to an outdoor yard space using a specialized hydraulic flatbed trailer operated by C&C Ventures.3:45 The transport requires precise positioning of the trailer’s six hydraulic arms against the boat’s transverse bulkheads to prevent frame torque.3:25 The crew aligns the pads under bulkhead 9 at the rear and bulkhead 5 at the forward section, using wooden blocks to clear the stringers.5:31 After lifting the vessel, the team maneuvers it through a narrow exit path, clearing two parked vehicles that required moving by the marina manager.8:37 Once positioned in the yard, the boat is leveled on a foundation of foam blocks, paving stones, and plywood, with final adjustments made using bottle jacks to achieve a three-quarter-inch tolerance.12:49 The project concludes with a exterior wash to remove three years of accumulated dust and grime.15:24 The crew plans to manage the vessel's exposure to outdoor elements while completing final preparations for launch.17:47
Altro da MJ Sailing
Da MJ Sailing — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



