MJ Sailingvidéo
Seeing ALL Of Our Catamaran For The FIRST TIME!! (MJ Sailing - Ep 340)
31 août 2024 · 18 min · 158K vues · Kent Island
Ce que couvre cette vidéo
A catamaran undergoes a transition from a long-term indoor storage tent to an outdoor yard space using a specialized hydraulic flatbed trailer operated by C&C Ventures.3:45 The transport requires precise positioning of the trailer’s six hydraulic arms against the boat’s transverse bulkheads to prevent frame torque.3:25 The crew aligns the pads under bulkhead 9 at the rear and bulkhead 5 at the forward section, using wooden blocks to clear the stringers.5:31 After lifting the vessel, the team maneuvers it through a narrow exit path, clearing two parked vehicles that required moving by the marina manager.8:37 Once positioned in the yard, the boat is leveled on a foundation of foam blocks, paving stones, and plywood, with final adjustments made using bottle jacks to achieve a three-quarter-inch tolerance.12:49 The project concludes with a exterior wash to remove three years of accumulated dust and grime.15:24 The crew plans to manage the vessel's exposure to outdoor elements while completing final preparations for launch.17:47
Plus de vidéos de MJ Sailing
De MJ Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



