Acorn To Arabellavideo

Quick Haul-Out & Hull Inspection | Preparing Arabella for a Newfoundland Winter

28 novembre 2025 · 13 min · 32K visualizzazioni · Corner Brook

Cosa tratta questo video

Steve and Robin haul the boat Arabella out of the water in Corner Brook, Newfoundland, for a brief hull inspection and propeller removal before winter storage.0:14 The crew removes the feathering propeller for transport to New England, where it will undergo routine maintenance, including blade removal and internal gear lubrication.4:32 To prevent galvanic corrosion while the propeller is off, Steve installs a large sacrificial anode directly onto the propeller shaft, ensuring clean metal-to-metal contact by scrubbing the surface with a pad and putty knife.7:33 During the hull inspection, the crew identifies areas of scraped bottom paint on the ballast keel and the sacrificial worm shoe, both resulting from previous groundings.10:29 Steve determines that the exposed areas on the ballast keel and the plastic worm shoe do not require immediate repair, deferring repainting until the spring.11:07 The crew cleans barnacles from the hull before returning the vessel to the water for winter mooring.9:23

Guarda su YouTube

Altro da Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... Againott 2026Saying Goodbye to Newfoundland—and the Man Who Inspired Arabellaset 2026Upgrading the Rudder and Another Trek To The Cliffago 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coastlug 2026

Da Acorn To Arabella — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema