Acorn To Arabellavidéo

Quick Haul-Out & Hull Inspection | Preparing Arabella for a Newfoundland Winter

28 novembre 2025 · 13 min · 32K vues · Corner Brook

Ce que couvre cette vidéo

Steve and Robin haul the boat Arabella out of the water in Corner Brook, Newfoundland, for a brief hull inspection and propeller removal before winter storage.0:14 The crew removes the feathering propeller for transport to New England, where it will undergo routine maintenance, including blade removal and internal gear lubrication.4:32 To prevent galvanic corrosion while the propeller is off, Steve installs a large sacrificial anode directly onto the propeller shaft, ensuring clean metal-to-metal contact by scrubbing the surface with a pad and putty knife.7:33 During the hull inspection, the crew identifies areas of scraped bottom paint on the ballast keel and the sacrificial worm shoe, both resulting from previous groundings.10:29 Steve determines that the exposed areas on the ballast keel and the plastic worm shoe do not require immediate repair, deferring repainting until the spring.11:07 The crew cleans barnacles from the hull before returning the vessel to the water for winter mooring.9:23

Regarder sur YouTube

Plus de vidéos de Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... Againoct. 2026Saying Goodbye to Newfoundland—and the Man Who Inspired Arabellasept. 2026Upgrading the Rudder and Another Trek To The Cliffaoût 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coastjuil. 2026

De Acorn To Arabella — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème