Acorn To Arabellavidéo

Quick Haul-Out & Hull Inspection | Preparing Arabella for a Newfoundland Winter

28 novembre 2025 · 13 min · 32K vues · Corner Brook

Ce que couvre cette vidéo

Steve and Robin haul the boat Arabella out of the water in Corner Brook, Newfoundland, for a brief hull inspection and propeller removal before winter storage.0:14 The crew removes the feathering propeller for transport to New England, where it will undergo routine maintenance, including blade removal and internal gear lubrication.4:32 To prevent galvanic corrosion while the propeller is off, Steve installs a large sacrificial anode directly onto the propeller shaft, ensuring clean metal-to-metal contact by scrubbing the surface with a pad and putty knife.7:33 During the hull inspection, the crew identifies areas of scraped bottom paint on the ballast keel and the sacrificial worm shoe, both resulting from previous groundings.10:29 Steve determines that the exposed areas on the ballast keel and the plastic worm shoe do not require immediate repair, deferring repainting until the spring.11:07 The crew cleans barnacles from the hull before returning the vessel to the water for winter mooring.9:23

Regarder sur YouTube

Plus de vidéos de Acorn To Arabella

Upgrading the Rudder and Another Trek To The Cliffaoût 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coastjuil. 2026Exploring Newfoundland's Unclimbed Coastal Cliffs by Sailboatjuil. 2026Fjord Hopping | Arabella Sails East Toward The Nuddickjuil. 2026

De Acorn To Arabella — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème