Sailing Squibvideo

Squib's Refit - Balancing the boat - Installing deck hardware /99

26 dicembre 2024 · 18 min · 931 visualizzazioni

Cosa tratta questo video

The crew levels the boat Squib on land using two hydraulic jacks and wooden shims to adjust the hull's orientation.0:37 They monitor the boat's level with a spirit level, incrementally adjusting the jacks and swapping shims until the vessel sits evenly.5:38 Following the leveling, the crew attempts to reinstall deck hardware, encountering difficulties with mismatched thread types.7:58 They discover that some existing hardware requires imperial-threaded bolts, while they only possess metric nuts, necessitating a trip to a marine supply store for compatible hardware.10:55 During the installation of a specific deck fitting, the crew struggles with access to the underside, where a nut is obstructed by laminated fiberglass and a bulkhead.15:49 They resolve this by driving a longer bolt through the obstruction with a hammer to clear the path.16:14 The project concludes with the purchase of new foot switches, various fasteners, and washers to complete the deck hardware refit.17:51

Guarda su YouTube

Altro da Sailing Squib

Sailing Squib - May 2026/3set 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnesslug 2026Sailing Squib - May 2026 /1lug 2026

Da Sailing Squib — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema