Sailing Squibvidéo

Squib's Refit - Balancing the boat - Installing deck hardware /99

26 décembre 2024 · 18 min · 931 vues

Ce que couvre cette vidéo

The crew levels the boat Squib on land using two hydraulic jacks and wooden shims to adjust the hull's orientation.0:37 They monitor the boat's level with a spirit level, incrementally adjusting the jacks and swapping shims until the vessel sits evenly.5:38 Following the leveling, the crew attempts to reinstall deck hardware, encountering difficulties with mismatched thread types.7:58 They discover that some existing hardware requires imperial-threaded bolts, while they only possess metric nuts, necessitating a trip to a marine supply store for compatible hardware.10:55 During the installation of a specific deck fitting, the crew struggles with access to the underside, where a nut is obstructed by laminated fiberglass and a bulkhead.15:49 They resolve this by driving a longer bolt through the obstruction with a hammer to clear the path.16:14 The project concludes with the purchase of new foot switches, various fasteners, and washers to complete the deck hardware refit.17:51

Regarder sur YouTube

Plus de vidéos de Sailing Squib

Sailing Squib - May 2026/3sept. 2026Sailing Squib May 2026 /2août 2026Sailing Squib - Contemporary Witnessjuil. 2026Sailing Squib - May 2026 /1juil. 2026

De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème