Hold Fast!video

S/V SeaSprite Refit Update 8 September 2026

8 settembre 2026 · 2 min · 2K visualizzazioni · Phipps Boatworks, Harrington Harbor North, Maryland

Cosa tratta questo video

The Sea SPRITE 30 has been moved into the Phipps Boatworks building at Harrington Harbor North, where the shrink wrap and frame have been removed and a refit is underway.0:34 The interior is being cleared out — deck hardware has been boxed up, though the box is heavy enough to require help moving, and the stove also needs assistance to remove.0:39 Some items remain aboard temporarily while Lizzie thinks through what will be needed during the project versus what can be staged off the boat.1:43 The building has a large full-building fan running, which matters given warm outside temperatures.0:26 The work is in early-stage organization: the priority is stripping unnecessary gear to give clear access for the project ahead.0:39 Phipps Boatworks is described as a well-equipped facility with the tools and resources needed for a refit of this scope.1:47

Guarda su YouTube

Barche in questo video

Cabo RICO 38La loro barcaCabo RICO 56La loro barcaSea SPRITE 30La loro barca

Altro da Hold Fast!

S/V SeaSprite Refit Update 4 Oct 2026ott 2026Hinckley Bermuda 40 MKIII Survey & Sea Trial ott 2026S/V SeaSprite Refit Update 18-20 Sep 2026set 2026S/V SeaSprite Refit Update 9 September 2026set 2026

Da Hold Fast! — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema