Hold Fast!video

S/V SeaSprite Refit Update 18-20 Sep 2026

20 settembre 2026 · 4 min · 1K visualizzazioni · Phipps Footworks

Cosa tratta questo video

Refinishing the teak on the S/V SeaSprite involves stripping and sanding the cockpit coaming boards, the eyebrow, and the toe rail.0:35 After initial sanding with 120-grit paper, the coaming boards required an 80-grit pass to remove remaining varnish before finishing with 120-grit.2:46 The cockpit cubbies and radiuses were sanded by hand.3:04 The project includes installing midship cleats into the toe rail to improve spring line handling, addressing a design oversight that previously forced the use of shrouds or cockpit winches for mooring.1:36 The mast and boom were moved to the Phipps Footworks shed for painting.2:17 Additional upgrades include replacing old plastic cockpit drains with new bronze units from Spartan and installing mid-rail chocks.4:31 Old adhesive sealant was removed from the starboard side coaming area in preparation for final cleaning with acetone and subsequent varnishing.4:05

Guarda su YouTube

Barche in questo video

Sea SPRITE 30La loro barcaCabo RICO 38La loro barcaCabo RICO 56La loro barca

Altro da Hold Fast!

S/V SeaSprite Refit Update 9 September 2026set 2026S/V SeaSprite Refit Update 8 September 2026set 2026S/V SeaSprite Refit Update - 4 Sep 2026set 2026S/V SeaSprite Refit Update - 19 August 2026ago 2026

Da Hold Fast! — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema