Catamaran Mistertong video
#204 We're setting up a real workshop under our catamaran…
28 marzo 2026 · 45 min · 6K visualizzazioni · Tyrell Bay, Carriacou, Grenada
Carpenter fits metal bracket onto wooden bowsprit frame
Cosa tratta questo video
The owners of an Outremer catamaran perform structural repairs on the boat’s mast beam while hauled out at a shipyard in Tyrelbae.0:05 The project involves rebuilding the beam’s internal structure, including the installation of a new anchor roller housing.5:53 To ensure structural integrity, the crew reinforces the beam with plywood and fiberglass, using peel ply to minimize post-curing sanding.11:45 During the process, the team encounters a setback when temporary sawhorses collapse under the weight of the materials, necessitating the addition of structural bracing.10:45 The repair requires precise fitting of gutters and fiberglass layers to protect the bow area from chain and anchor abrasion.21:11 The owners opt to support the rig with halyards rather than unstepping the mast, as internal inspections confirm the mast step area remains sound.30:48 The work is part of a larger, multi-day restoration effort to address structural issues discovered after purchase.40:11
Altro da Catamaran Mistertong
Da Catamaran Mistertong — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



