Catamaran Mistertong vidéo
#204 We're setting up a real workshop under our catamaran…
28 mars 2026 · 45 min · 6K vues · Tyrell Bay, Carriacou, Grenada
Carpenter fits metal bracket onto wooden bowsprit frame
Ce que couvre cette vidéo
The owners of an Outremer catamaran perform structural repairs on the boat’s mast beam while hauled out at a shipyard in Tyrelbae.0:05 The project involves rebuilding the beam’s internal structure, including the installation of a new anchor roller housing.5:53 To ensure structural integrity, the crew reinforces the beam with plywood and fiberglass, using peel ply to minimize post-curing sanding.11:45 During the process, the team encounters a setback when temporary sawhorses collapse under the weight of the materials, necessitating the addition of structural bracing.10:45 The repair requires precise fitting of gutters and fiberglass layers to protect the bow area from chain and anchor abrasion.21:11 The owners opt to support the rig with halyards rather than unstepping the mast, as internal inspections confirm the mast step area remains sound.30:48 The work is part of a larger, multi-day restoration effort to address structural issues discovered after purchase.40:11
Plus de vidéos de Catamaran Mistertong
De Catamaran Mistertong — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



