Expedition Evansvideo

A NEW CHAPTER | EE 145

24. januar 2024 · 21 min · 94K visninger

Hva denne videoen dekker

Brett and Jade Evans construct a temporary, plastic-sheathed enclosure in a workshop space to contain dust and fumes during an upcoming fiberglass and foam-cutting project.Watch They frame the structure using wood, staples, and plastic sheeting, creating a 4-meter by 3-meter workspace designed to maintain heat and provide a controlled environment for building an arch.4:41 The pair utilizes a clamp for structural support and adds a hinged door to facilitate access for materials and ventilation.3:28 Following the completion of the enclosure, they announce the launch of a secondary channel, Expedition Engineering, which will host detailed technical content regarding the build, while the Expedition Evans channel will continue to focus on sailing and travel adventures.19:50 The couple also spends time rock climbing at a local gym in Barcelona to maintain physical and mental health during the project preparation phase.7:27

Se på YouTube

Mer fra Expedition Evans

Woke Up...And Nature Chose VIOLENCE ( aka LEAVE NOW!) | EE 178sep. 2026We Disappeared... (Alone in the Remote Islands) | EE 177sep. 2026What It's Really Like Anchored Off a UNINHABITED Island | EE 176mai 2026Why Everyone is QUITTING Sailing | EE 175mai 2026

Fra Expedition Evans – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem