Expedition Evansvídeo
A NEW CHAPTER | EE 145
24 de janeiro de 2024 · 21 min · 94K visualizações
O que este vídeo aborda
Brett and Jade Evans construct a temporary, plastic-sheathed enclosure in a workshop space to contain dust and fumes during an upcoming fiberglass and foam-cutting project.Watch They frame the structure using wood, staples, and plastic sheeting, creating a 4-meter by 3-meter workspace designed to maintain heat and provide a controlled environment for building an arch.4:41 The pair utilizes a clamp for structural support and adds a hinged door to facilitate access for materials and ventilation.3:28 Following the completion of the enclosure, they announce the launch of a secondary channel, Expedition Engineering, which will host detailed technical content regarding the build, while the Expedition Evans channel will continue to focus on sailing and travel adventures.19:50 The couple also spends time rock climbing at a local gym in Barcelona to maintain physical and mental health during the project preparation phase.7:27
Mais de Expedition Evans
De Expedition Evans — veja o barco, a tripulação e todos os vídeos analisados do canal.
The Sailing Directory Newsletter
Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.



