Expedition Evansvídeo

A NEW CHAPTER | EE 145

24 de enero de 2024 · 21 min · 94K visitas

Qué cubre este vídeo

Brett and Jade Evans construct a temporary, plastic-sheathed enclosure in a workshop space to contain dust and fumes during an upcoming fiberglass and foam-cutting project.Watch They frame the structure using wood, staples, and plastic sheeting, creating a 4-meter by 3-meter workspace designed to maintain heat and provide a controlled environment for building an arch.4:41 The pair utilizes a clamp for structural support and adds a hinged door to facilitate access for materials and ventilation.3:28 Following the completion of the enclosure, they announce the launch of a secondary channel, Expedition Engineering, which will host detailed technical content regarding the build, while the Expedition Evans channel will continue to focus on sailing and travel adventures.19:50 The couple also spends time rock climbing at a local gym in Barcelona to maintain physical and mental health during the project preparation phase.7:27

Ver en YouTube

Más de Expedition Evans

Woke Up...And Nature Chose VIOLENCE ( aka LEAVE NOW!) | EE 178sept 2026We Disappeared... (Alone in the Remote Islands) | EE 177sept 2026What It's Really Like Anchored Off a UNINHABITED Island | EE 176may 2026Why Everyone is QUITTING Sailing | EE 175may 2026

De Expedition Evans — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema