Mer
Språk
Visningsmodus
Catamaran Mistertong video
2. mai 2026 · 1t 1m · 8K visninger
Hva denne videoen dekker
Djé and Nad continue structural repairs on their Outremer catamaran, focusing on replacing rotted bulkheads and reinforcing the beam structure to prepare for the installation of new trampolines.▶ 1:06 The crew removes two damaged bulkheads and prepares the area for new fiberglass laminates, applying three layers of glass to critical stress points to ensure long-term durability.▶ 1:08 To manage water drainage in the forward lockers and anchor locker, they install flexible PVC tubing routed through the bulkheads, sealing the penetrations with epoxy inserts to maintain structural integrity and prevent rot.▶ 19:38 The project includes extensive fairing, sanding, and filling of the deck and beam areas, with plans to finish the surfaces with KiwiGrip non-skid coating.▶ 3:53 The team also organizes the storage lockers to accommodate gear like boat hooks and paddles.▶ 6:40 Despite the ongoing construction environment, the owners prioritize these structural reinforcements to finalize the deck layout and prepare the vessel for future sailing.
Mer fra Catamaran Mistertong
Fra Catamaran Mistertong – se kanalens båt, mannskap og alle analyserte videoer.