Catamaran Mistertong video

#214 We can finally imagine ourselves on our trampolines

May 2, 2026 · 1h 1m · 8K views

What this video covers

Djé and Nad continue structural repairs on their Outremer catamaran, focusing on replacing rotted bulkheads and reinforcing the beam structure to prepare for the installation of new trampolines. The crew removes two damaged bulkheads and prepares the area for new fiberglass laminates, applying three layers of glass to critical stress points to ensure long-term durability.1:08 To manage water drainage in the forward lockers and anchor locker, they install flexible PVC tubing routed through the bulkheads, sealing the penetrations with epoxy inserts to maintain structural integrity and prevent rot.19:15 The project includes extensive fairing, sanding, and filling of the deck and beam areas, with plans to finish the surfaces with KiwiGrip non-skid coating.3:26 The team also organizes the storage lockers to accommodate gear like boat hooks and paddles.6:40 Despite the ongoing construction environment, the owners prioritize these structural reinforcements to finalize the deck layout and prepare the vessel for future sailing.

Watch on YouTube

More from Catamaran Mistertong

#250 I'm refused because of my outfit ...Sep 2026#249 The burden of paperwork ...Aug 2026#248 Despite the work, we're having a good time with friends ..Aug 2026#247 We're getting our driver's licenses...Aug 2026

From Catamaran Mistertong — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue