Catamaran Mistertong vídeo

#214 We can finally imagine ourselves on our trampolines

2 de maio de 2026 · 1h 1m · 8K visualizações

O que este vídeo aborda

Djé and Nad continue structural repairs on their Outremer catamaran, focusing on replacing rotted bulkheads and reinforcing the beam structure to prepare for the installation of new trampolines. The crew removes two damaged bulkheads and prepares the area for new fiberglass laminates, applying three layers of glass to critical stress points to ensure long-term durability.1:08 To manage water drainage in the forward lockers and anchor locker, they install flexible PVC tubing routed through the bulkheads, sealing the penetrations with epoxy inserts to maintain structural integrity and prevent rot.19:15 The project includes extensive fairing, sanding, and filling of the deck and beam areas, with plans to finish the surfaces with KiwiGrip non-skid coating.3:26 The team also organizes the storage lockers to accommodate gear like boat hooks and paddles.6:40 Despite the ongoing construction environment, the owners prioritize these structural reinforcements to finalize the deck layout and prepare the vessel for future sailing.

Ver no YouTube

Mais de Catamaran Mistertong

#250 I'm refused because of my outfit ...09/2026#249 The burden of paperwork ...08/2026#248 Despite the work, we're having a good time with friends ..08/2026#247 We're getting our driver's licenses...08/2026

De Catamaran Mistertong — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema