Sailing Yabávideo

Installing the one missing piece that was holding us back! — Sailing Yabá #52

31. oktober 2021 · 26 min · 129K visninger

Hva denne videoen dekker

Shipwrights at a shipyard are performing a major structural restoration on the wooden hull and deck of Yabá.0:15 The team is replacing rotted sections of the superstructure and deck planks, utilizing a zigzag joint pattern to ensure structural integrity and water resistance.3:47 Recent progress includes completing the starboard deck and installing the final covering board, a critical milestone that allows for the subsequent installation of bulwark columns and the gunwale.21:13 The crew is also fabricating a new bow hatch lid, which requires precise beveling of the planks to accommodate future caulking.17:25 With the arrival of a new shipment of timber, the project has moved into a phase where the primary wooden components of the deck and bulwarks can be finalized.16:55 The team is currently countersinking screws and sealing gaps with Sikaflex to prepare the surfaces for finishing.24:46

Se på YouTube

Mer fra Sailing Yabá

Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáaug. 2026Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing Yabáaug. 2026This Anchorage Was Worth Every Miserable Mile — Sailing Yabáaug. 2026Sailing Fully Rigged at Night After Emergency Repairs — Sailing Yabáaug. 2026

Fra Sailing Yabá – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem