Sailing Yabávídeo

Installing the one missing piece that was holding us back! — Sailing Yabá #52

31 de outubro de 2021 · 26 min · 129K visualizações

O que este vídeo aborda

Shipwrights at a shipyard are performing a major structural restoration on the wooden hull and deck of Yabá.0:15 The team is replacing rotted sections of the superstructure and deck planks, utilizing a zigzag joint pattern to ensure structural integrity and water resistance.3:47 Recent progress includes completing the starboard deck and installing the final covering board, a critical milestone that allows for the subsequent installation of bulwark columns and the gunwale.21:13 The crew is also fabricating a new bow hatch lid, which requires precise beveling of the planks to accommodate future caulking.17:25 With the arrival of a new shipment of timber, the project has moved into a phase where the primary wooden components of the deck and bulwarks can be finalized.16:55 The team is currently countersinking screws and sealing gaps with Sikaflex to prepare the surfaces for finishing.24:46

Ver no YouTube

Mais de Sailing Yabá

Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabá08/2026Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing Yabá08/2026This Anchorage Was Worth Every Miserable Mile — Sailing Yabá08/2026Sailing Fully Rigged at Night After Emergency Repairs — Sailing Yabá08/2026

De Sailing Yabá — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema