Sailing Yabávídeo

Installing the one missing piece that was holding us back! — Sailing Yabá #52

31 de octubre de 2021 · 26 min · 129K visitas

Qué cubre este vídeo

Shipwrights at a shipyard are performing a major structural restoration on the wooden hull and deck of Yabá.0:15 The team is replacing rotted sections of the superstructure and deck planks, utilizing a zigzag joint pattern to ensure structural integrity and water resistance.3:47 Recent progress includes completing the starboard deck and installing the final covering board, a critical milestone that allows for the subsequent installation of bulwark columns and the gunwale.21:13 The crew is also fabricating a new bow hatch lid, which requires precise beveling of the planks to accommodate future caulking.17:25 With the arrival of a new shipment of timber, the project has moved into a phase where the primary wooden components of the deck and bulwarks can be finalized.16:55 The team is currently countersinking screws and sealing gaps with Sikaflex to prepare the surfaces for finishing.24:46

Ver en YouTube

Más de Sailing Yabá

Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáago 2026Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing Yabáago 2026This Anchorage Was Worth Every Miserable Mile — Sailing Yabáago 2026Sailing Fully Rigged at Night After Emergency Repairs — Sailing Yabáago 2026

De Sailing Yabá — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema