Wildling Sailingvideo

Big Progress on the Old Project Catamaran | Wildlings Sailing

2. juli 2021 · 29 min · 157K visninger

Hva denne videoen dekker

Restoration work on a 1975 catamaran focuses on structural repairs and deck outfitting. The crew reinforces four solar panels on the davits using L-shaped aluminum profiles and steel brackets to prevent flexing, ultimately achieving an output of 18.3 amps.18:44 Deck maintenance includes drilling out rotten core material to install new Bimini fittings, which are then sealed with epoxy and fiberglass.0:55 To improve interior ergonomics, the team cuts 17 centimeters off the saloon table to ease access.13:11 Additional projects include cleaning and shaping the skegs and rudders, testing an 8-horsepower Mercury outboard motor, and installing a new helm chair.26:09 The team also marks 50 meters of anchor chain with silver and blue indicators.1:58 The project highlights the iterative nature of boat refits, where material availability and structural challenges often require redesigning initial plans.11:34

Se på YouTube

Mer fra Wildling Sailing

One Final Refit Before Crossing The Atlantic.aug. 20262 Days Alone at Sea On my Primitive Double-Canoe.aug. 2026A Night Passage Through Orca Territoryjuli 2026Getting Very Comfortable Solo Sailing My Big Catamaranjuli 2026

Fra Wildling Sailing – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem