Wildling Sailingvideo

Big Progress on the Old Project Catamaran | Wildlings Sailing

July 2, 2021 · 29 min · 157K views

What this video covers

Restoration work on a 1975 catamaran focuses on structural repairs and deck outfitting. The crew reinforces four solar panels on the davits using L-shaped aluminum profiles and steel brackets to prevent flexing, ultimately achieving an output of 18.3 amps.18:44 Deck maintenance includes drilling out rotten core material to install new Bimini fittings, which are then sealed with epoxy and fiberglass.0:55 To improve interior ergonomics, the team cuts 17 centimeters off the saloon table to ease access.13:11 Additional projects include cleaning and shaping the skegs and rudders, testing an 8-horsepower Mercury outboard motor, and installing a new helm chair.26:09 The team also marks 50 meters of anchor chain with silver and blue indicators.1:58 The project highlights the iterative nature of boat refits, where material availability and structural challenges often require redesigning initial plans.11:34

Watch on YouTube

More from Wildling Sailing

One Final Refit Before Crossing The Atlantic.Aug 20262 Days Alone at Sea On my Primitive Double-Canoe.Aug 2026A Night Passage Through Orca TerritoryJul 2026Getting Very Comfortable Solo Sailing My Big CatamaranJul 2026

From Wildling Sailing — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue