Entre Terras e Maresvideo
UPPER CABINET OF THE BOW SUITE BED T1. ep 163
3. august 2025 · 20 min · 542 visninger
Hva denne videoen dekker
Edgar and Sâmia construct custom storage cabinets for the forward suite of their boat, focusing on overhead units above the berth.▶ 2:39 The build involves cutting wooden components by hand and securing them with epoxy adhesive to the existing bulkhead structure.▶ 11:33 To ensure long-term durability and moisture resistance, the team plans to laminate all internal joints and surfaces with polyester resin, a step they defer until after the structural assembly is complete. The design includes a front lip on the shelves to prevent items from sliding out and a dedicated space for small personal effects like phones or water bottles.▶ 1:32 While the primary cabinet structure is now fixed in place, the installation of the four cabinet doors remains pending until the surrounding bulkheads are fully laminated.▶ 14:49 Beyond the forward suite, the project list includes completing the navigation station, electrical control cabinet, and the internal helm totem, followed by final surface finishing with laminate and formica.▶ 17:30
Mer fra Entre Terras e Mares
Fra Entre Terras e Mares – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



