Entre Terras e Maresvideo
UPPER CABINET OF THE BOW SUITE BED T1. ep 163
3 August 2025 · 20 min · 545 views
What this video covers
Edgar and Sâmia construct custom storage cabinets for the forward suite of their boat, focusing on overhead units above the berth.2:38 The build involves cutting wooden components by hand and securing them with epoxy adhesive to the existing bulkhead structure.Watch To ensure long-term durability and moisture resistance, the team plans to laminate all internal joints and surfaces with polyester resin, a step they defer until after the structural assembly is complete.10:30 The design includes a front lip on the shelves to prevent items from sliding out and a dedicated space for small personal effects like phones or water bottles.3:21 While the primary cabinet structure is now fixed in place, the installation of the four cabinet doors remains pending until the surrounding bulkheads are fully laminated.15:03 Beyond the forward suite, the project list includes completing the navigation station, electrical control cabinet, and the internal helm totem, followed by final surface finishing with laminate and formica.17:23
More from Entre Terras e Mares
From Entre Terras e Mares — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



