Entre Terras e Maresvideo

UPPER CABINET OF THE BOW SUITE BED T1. ep 163

August 3, 2025 · 20 min · 545 views

What this video covers

Edgar and Sâmia construct custom storage cabinets for the forward suite of their boat, focusing on overhead units above the berth.2:38 The build involves cutting wooden components by hand and securing them with epoxy adhesive to the existing bulkhead structure.Watch To ensure long-term durability and moisture resistance, the team plans to laminate all internal joints and surfaces with polyester resin, a step they defer until after the structural assembly is complete.10:30 The design includes a front lip on the shelves to prevent items from sliding out and a dedicated space for small personal effects like phones or water bottles.3:21 While the primary cabinet structure is now fixed in place, the installation of the four cabinet doors remains pending until the surrounding bulkheads are fully laminated.15:03 Beyond the forward suite, the project list includes completing the navigation station, electrical control cabinet, and the internal helm totem, followed by final surface finishing with laminate and formica.17:23

Watch on YouTube

More from Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183Jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182Jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181Jun 2026This week the focus was on something elseJun 2026

From Entre Terras e Mares — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue