Sailing Umavideo
1,300 Legends on our 36 ft Boat | Step 426
1. februar 2025 · 22 min · 111K visninger
Hva denne videoen dekker
The crew of the 36-ft boat Uma reinforces the V-berth hull by installing two-centimeter-thick fiberglass mini-ribs in a cross pattern to eliminate structural flexing during passages.1:40 After grinding the hull surface, they bond the ribs with fiberglass and epoxy to stiffen the laminate before applying insulation.2:16 The team also decides to mount the chain plates on the interior of the hull rather than the exterior, opting to reinforce the bulkhead areas with six layers of 400-gram biaxial fiberglass on each side.9:00 Before sealing the hull with insulation, the crew hand-writes the names of over 1,300 Patreon supporters directly onto the interior fiberglass surfaces, creating a permanent, hidden record of their contributors.12:36 They plan to photograph the names for documentation before covering them with insulation.21:11 Adding structural ribs and reinforcing chain plate bulkheads provides the necessary stiffness to prevent hull deformation in heavy seas.
Mer fra Sailing Uma
Fra Sailing Uma – se kanalens båt, mannskap og alle analyserte videoer.
The Sailing Directory Newsletter
Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.



