sailing.directory
KanalerBÄterSpÞrOm
🇳🇮
đŸ‡ș🇾English🇬🇧English (UK)đŸ‡ČđŸ‡œEspañol (MĂ©xico)đŸ‡Ș🇾Español (España)đŸ‡«đŸ‡·Français🇼đŸ‡čItalianođŸ‡”đŸ‡čPortuguĂȘs (Portugal)đŸ‡§đŸ‡·PortuguĂȘs (Brasil)đŸ‡ŹđŸ‡·Î•Î»Î»Î·ÎœÎčÎșά🇳🇮Norsk
Logg inn
sailing.directory

En indeks over seilkanaler pĂ„ YouTube — sĂžkbar etter tema, navigerbar etter interesse. Nye kanaler og bĂ„ter, indeksert ukentlig. Ingen stĂžy.

Utforsk

KanalerBÄterSÞkOmForeslÄ en kanal

Skapere og juss

StÞtt ossFor skaperePersonvernVilkÄrDMCA

Ikke navigasjonsrÄd · © 2026

HjemKanalerBÄter

Mer

SĂžkSpĂžrOmStĂžtt ossFor skapereLogg inn

SprÄk

đŸ‡ș🇾English🇬🇧English (UK)đŸ‡ČđŸ‡œEspañol (MĂ©xico)đŸ‡Ș🇾Español (España)đŸ‡«đŸ‡·Français🇼đŸ‡čItalianođŸ‡”đŸ‡čPortuguĂȘs (Portugal)đŸ‡§đŸ‡·PortuguĂȘs (Brasil)đŸ‡ŹđŸ‡·Î•Î»Î»Î·ÎœÎčÎșά🇳🇮Norsk

Visningsmodus

sailing.directory
KanalerBÄterSpÞrOm
🇳🇮
đŸ‡ș🇾English🇬🇧English (UK)đŸ‡ČđŸ‡œEspañol (MĂ©xico)đŸ‡Ș🇾Español (España)đŸ‡«đŸ‡·Français🇼đŸ‡čItalianođŸ‡”đŸ‡čPortuguĂȘs (Portugal)đŸ‡§đŸ‡·PortuguĂȘs (Brasil)đŸ‡ŹđŸ‡·Î•Î»Î»Î·ÎœÎčÎșά🇳🇮Norsk
Logg inn

Sailing SV Delos · video

A HUGE Transformation is Coming đŸ˜± (Building Our Own Aluminum Catamaran Pt. 70)

22. mai 2026 · 21 min · 215K visninger · Australia

Couple stands atop unfinished aluminum catamaran hull

Se pÄ YouTube

Hva denne videoen dekker

The interior fit-out of a custom aluminum catamaran requires precise logistical coordination to manage interdependent tasks between contractors.▶ 9:44 To prepare the port-side cabins for upholstery, the crew removes wall panels while ensuring each is numbered and marked for orientation.▶ 10:23 Maintaining consistent grain or texture direction on vinyl-covered panels is critical, as light reflection can cause color variations if pieces are installed in different directions.▶ 12:24 The team utilizes a fast-mount fastener system, similar to jean-jacket buttons, which allows for easy panel removal to access underlying plumbing, wiring, and fuel lines.▶ 12:44 Before final installation, the crew sands high-traffic plywood surfaces—previously faired with compound and fiberglass—to prepare them for two-pack paint application.▶ 17:08 The project follows a strict sequence where painting, cabinetry installation, and upholstery must occur in a specific order to avoid damage to finished surfaces.▶ 9:45 Proper sequencing of sub-contractor tasks prevents rework and ensures that structural elements like door jambs do not obstruct final finishing work.▶ 18:13

Mer fra Sailing SV Delos

Is This the Turning Point??? Aluminum Catamaran Build Pt. 75juli 2026We Held Our Breath And Turned It On đŸ«Ł Aluminum Catamaran Build Pt. 75juni 2026Designing Sails for Our CUSTOM Catamaran!juni 2026Building the Command Center of Our Dream Boat đŸ€© (Aluminum Catamaran Build Pt. 72)juni 2026

Fra Sailing SV Delos – se kanalens bĂ„t, mannskap og alle analyserte videoer.

Rapporter et problem
HjemKanalerBÄter

Mer

SĂžkSpĂžrOmStĂžtt ossFor skapereLogg inn

SprÄk

đŸ‡ș🇾English🇬🇧English (UK)đŸ‡ČđŸ‡œEspañol (MĂ©xico)đŸ‡Ș🇾Español (España)đŸ‡«đŸ‡·Français🇼đŸ‡čItalianođŸ‡”đŸ‡čPortuguĂȘs (Portugal)đŸ‡§đŸ‡·PortuguĂȘs (Brasil)đŸ‡ŹđŸ‡·Î•Î»Î»Î·ÎœÎčÎșά🇳🇮Norsk

Visningsmodus

sailing.directory

En indeks over seilkanaler pĂ„ YouTube — sĂžkbar etter tema, navigerbar etter interesse. Nye kanaler og bĂ„ter, indeksert ukentlig. Ingen stĂžy.

Utforsk

KanalerBÄterSÞkOmForeslÄ en kanal

Skapere og juss

StÞtt ossFor skaperePersonvernVilkÄrDMCA

Ikke navigasjonsrÄd · © 2026