Plus
Langue
Mode d'affichage
Sailing SV Delosvidéo
22 mai 2026 · 21 min · 215K vues · Australia
Couple stands atop unfinished aluminum catamaran hull
Ce que couvre cette vidéo
The interior fit-out of a custom aluminum catamaran requires precise logistical coordination to manage interdependent tasks between contractors.▶ 9:44 To prepare the port-side cabins for upholstery, the crew removes wall panels while ensuring each is numbered and marked for orientation.▶ 10:23 Maintaining consistent grain or texture direction on vinyl-covered panels is critical, as light reflection can cause color variations if pieces are installed in different directions.▶ 12:24 The team utilizes a fast-mount fastener system, similar to jean-jacket buttons, which allows for easy panel removal to access underlying plumbing, wiring, and fuel lines.▶ 12:44 Before final installation, the crew sands high-traffic plywood surfaces—previously faired with compound and fiberglass—to prepare them for two-pack paint application.▶ 17:08 The project follows a strict sequence where painting, cabinetry installation, and upholstery must occur in a specific order to avoid damage to finished surfaces.▶ 9:45 Proper sequencing of sub-contractor tasks prevents rework and ensures that structural elements like door jambs do not obstruct final finishing work.▶ 18:13
Plus de vidéos de Sailing SV Delos
De Sailing SV Delos — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.