sailing.directory
CanaisBarcosPerguntarSobre
🇵🇹
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sessão
sailing.directory

Um índice dos canais de vela no YouTube — pesquisável por tema, navegável por interesse. Novos canais e barcos, indexados todas as semanas. Sem ruído.

Explorar

CanaisBarcosPesquisarSobreSugerir um canal

Criadores e informação legal

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é conselho de navegação · © 2026

InícioCanaisBarcos

Mais

PesquisarPerguntarSobreApoiarPara criadoresIniciar sessão

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualização

sailing.directory
CanaisBarcosPerguntarSobre
🇵🇹
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Iniciar sessão

Sailing SV Delos · vídeo

A HUGE Transformation is Coming 😱 (Building Our Own Aluminum Catamaran Pt. 70)

22 de maio de 2026 · 21 min · 215K visualizações · Australia

Couple stands atop unfinished aluminum catamaran hull

Ver no YouTube

O que este vídeo aborda

The interior fit-out of a custom aluminum catamaran requires precise logistical coordination to manage interdependent tasks between contractors.▶ 9:44 To prepare the port-side cabins for upholstery, the crew removes wall panels while ensuring each is numbered and marked for orientation.▶ 10:23 Maintaining consistent grain or texture direction on vinyl-covered panels is critical, as light reflection can cause color variations if pieces are installed in different directions.▶ 12:24 The team utilizes a fast-mount fastener system, similar to jean-jacket buttons, which allows for easy panel removal to access underlying plumbing, wiring, and fuel lines.▶ 12:44 Before final installation, the crew sands high-traffic plywood surfaces—previously faired with compound and fiberglass—to prepare them for two-pack paint application.▶ 17:08 The project follows a strict sequence where painting, cabinetry installation, and upholstery must occur in a specific order to avoid damage to finished surfaces.▶ 9:45 Proper sequencing of sub-contractor tasks prevents rework and ensures that structural elements like door jambs do not obstruct final finishing work.▶ 18:13

Mais de Sailing SV Delos

Is This the Turning Point??? Aluminum Catamaran Build Pt. 7507/2026We Held Our Breath And Turned It On 🫣 Aluminum Catamaran Build Pt. 7506/2026Designing Sails for Our CUSTOM Catamaran!06/2026Building the Command Center of Our Dream Boat 🤩 (Aluminum Catamaran Build Pt. 72)06/2026

De Sailing SV Delos — veja o barco, a tripulação e todos os vídeos analisados do canal.

Reportar um problema
InícioCanaisBarcos

Mais

PesquisarPerguntarSobreApoiarPara criadoresIniciar sessão

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de visualização

sailing.directory

Um índice dos canais de vela no YouTube — pesquisável por tema, navegável por interesse. Novos canais e barcos, indexados todas as semanas. Sem ruído.

Explorar

CanaisBarcosPesquisarSobreSugerir um canal

Criadores e informação legal

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é conselho de navegação · © 2026