Sailing SV Cordeliavideo

We finally fitted the HYDROVANE and left Marina di Ragusa

21. mai 2021 · 16 min · 542 visninger · Marina di Ragusa

Hva denne videoen dekker

Steve and Annette install a Hydrovane self-steering system on SV Cordelia while docked at Marina di Ragusa. To mount the unit, Steve fabricates a custom standoff bracket using hardwood offcuts from sink cutouts.0:59 He shapes the wood to match the hull’s curvature by adhering sandpaper to the transom and sanding the bracket against the hull until it sits flush without rocking.3:21 The installation includes an extension piece to achieve the necessary height for the emergency rudder and bilge pump handle clearance.7:47 Following the installation and final provisioning, the crew departs for Syracuse to seek COVID-19 vaccinations.14:25 The couple plans to spend two months in Greece before considering an Atlantic crossing, citing the 90-day Schengen limit imposed by Brexit as a primary factor in their long-term route planning.13:45

Se på YouTube

Mer fra Sailing SV Cordelia

36 Knots in a Dinghy, Nearly Overboard, The Secret of why we leave Belizeaug. 2026Our TINY CHANNEL Went VIRAL Twice. Here's What YouTube Paid Usaug. 2026Hurricane Season Chased Us Into a FREE Belize Marinaaug. 2026Time-lapse Caribbean Crossing. Non-Stop. 1500milesjuli 2026

Fra Sailing SV Cordelia – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem