Sailing SV Cordeliavideo

We finally fitted the HYDROVANE and left Marina di Ragusa

May 21, 2021 · 16 min · 542 views · Marina di Ragusa

What this video covers

Steve and Annette install a Hydrovane self-steering system on SV Cordelia while docked at Marina di Ragusa. To mount the unit, Steve fabricates a custom standoff bracket using hardwood offcuts from sink cutouts.0:59 He shapes the wood to match the hull’s curvature by adhering sandpaper to the transom and sanding the bracket against the hull until it sits flush without rocking.3:21 The installation includes an extension piece to achieve the necessary height for the emergency rudder and bilge pump handle clearance.7:47 Following the installation and final provisioning, the crew departs for Syracuse to seek COVID-19 vaccinations.14:25 The couple plans to spend two months in Greece before considering an Atlantic crossing, citing the 90-day Schengen limit imposed by Brexit as a primary factor in their long-term route planning.13:45

Watch on YouTube

More from Sailing SV Cordelia

36 Knots in a Dinghy, Nearly Overboard, The Secret of why we leave BelizeAug 2026Our TINY CHANNEL Went VIRAL Twice. Here's What YouTube Paid UsAug 2026Hurricane Season Chased Us Into a FREE Belize MarinaAug 2026Time-lapse Caribbean Crossing. Non-Stop. 1500milesJul 2026

From Sailing SV Cordelia — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue