Sailing SV Cordeliavídeo

We finally fitted the HYDROVANE and left Marina di Ragusa

21 de maio de 2021 · 16 min · 542 visualizações · Marina di Ragusa

O que este vídeo aborda

Steve and Annette install a Hydrovane self-steering system on SV Cordelia while docked at Marina di Ragusa. To mount the unit, Steve fabricates a custom standoff bracket using hardwood offcuts from sink cutouts.0:59 He shapes the wood to match the hull’s curvature by adhering sandpaper to the transom and sanding the bracket against the hull until it sits flush without rocking.3:21 The installation includes an extension piece to achieve the necessary height for the emergency rudder and bilge pump handle clearance.7:47 Following the installation and final provisioning, the crew departs for Syracuse to seek COVID-19 vaccinations.14:25 The couple plans to spend two months in Greece before considering an Atlantic crossing, citing the 90-day Schengen limit imposed by Brexit as a primary factor in their long-term route planning.13:45

Assistir no YouTube

Mais de Sailing SV Cordelia

36 Knots in a Dinghy, Nearly Overboard, The Secret of why we leave Belizeago. de 2026Our TINY CHANNEL Went VIRAL Twice. Here's What YouTube Paid Usago. de 2026Hurricane Season Chased Us Into a FREE Belize Marinaago. de 2026Time-lapse Caribbean Crossing. Non-Stop. 1500milesjul. de 2026

De Sailing SV Cordelia — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema