sailing.directory
KanalerBåterSpørOm
🇳🇴
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Logg inn
sailing.directory

En indeks over seilkanaler på YouTube — søkbar etter tema, navigerbar etter interesse. Nye kanaler og båter, indeksert ukentlig. Ingen støy.

Utforsk

KanalerBåterSøkOmForeslå en kanal

Skapere og juss

Støtt ossFor skaperePersonvernVilkårDMCA

Ikke navigasjonsråd · © 2026

HjemKanalerBåter

Mer

SøkSpørOmStøtt ossFor skapereLogg inn

Språk

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Visningsmodus

sailing.directory
KanalerBåterSpørOm
🇳🇴
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Logg inn

Project Brupeg · video

The Water Maker Is Going Through A Dry Spell - Project Brupeg Ep.438

26. februar 2026 · 21 min · 13K visninger · Queensland, Australia

Se på YouTube

Hva denne videoen dekker

Installation of a DIY watermaker on the 10-year refit project vessel *BrewPeg* involves fabricating stainless steel and aluminum mounting brackets for the membrane, gauges, and DC pump within the engine room.▶ 1:20 The system utilizes a DC pump to draw water from a dedicated seacock through a strainer and filter assembly before feeding the membrane.▶ 2:21 The crew mounts the membrane housing using rubber-lined stainless straps and T-clamps, positioning the pressure gauges and needle valve for centralized control.▶ 2:39 Plumbing the system requires custom routing with 90-degree fittings and reducers to accommodate tight clearances, particularly for the high-pressure line exiting the membrane.▶ 7:53 The installation process involves lubricating O-rings with food-grade grease and securing the membrane with half-moon locking caps.▶ 6:01 Progress stalls due to a lack of specific plumbing fittings, forcing the crew to cannibalize parts from a separate fuel transfer system project.▶ 14:48 The high-pressure hose from the pump also presents a clearance issue, as the existing bend radius exceeds the available space between the mounted unit and the bulkhead.▶ 16:07

Mer fra Project Brupeg

Chased off Howick Island by a shark & Sediment Slicks in the Great Barrier Reef - Brupeg Ep.451juni 2026Moving Diesel from the Forward Tanks to the Back - Project Brupeg Ep.446mai 2026Brupeg at Thursday Island in the Torres Strait - Project Brupeg Ep.445mai 2026Brupeg's last year in 18 minutes! - Project Brupeg Ep.432jan. 2026

Fra Project Brupeg – se kanalens båt, mannskap og alle analyserte videoer.

Rapporter et problem
HjemKanalerBåter

Mer

SøkSpørOmStøtt ossFor skapereLogg inn

Språk

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Visningsmodus

sailing.directory

En indeks over seilkanaler på YouTube — søkbar etter tema, navigerbar etter interesse. Nye kanaler og båter, indeksert ukentlig. Ingen støy.

Utforsk

KanalerBåterSøkOmForeslå en kanal

Skapere og juss

Støtt ossFor skaperePersonvernVilkårDMCA

Ikke navigasjonsråd · © 2026