sailing.directory
KanalerBåterSpørOm
🇳🇴
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Logg inn
sailing.directory

En indeks over seilkanaler på YouTube — søkbar etter tema, navigerbar etter interesse. Nye kanaler og båter, indeksert ukentlig. Ingen støy.

Utforsk

KanalerBåterSøkOmForeslå en kanal

Skapere og juss

Støtt ossFor skaperePersonvernVilkårDMCA

Ikke navigasjonsråd · © 2026

HjemKanalerBåter

Mer

SøkSpørOmStøtt ossFor skapereLogg inn

Språk

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Visningsmodus

sailing.directory
KanalerBåterSpørOm
🇳🇴
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Logg inn

Sailing Uma · video

The Last Jobs Before We Step the Mast | Step 485

10. mai 2026 · 27 min · 110K visninger

Se på YouTube

Hva denne videoen dekker

Dan and Kika on Uma complete two structural upgrades required before re-stepping the mast after roughly two years of sailing without one.▶ 0:00 The first is replacing a 50-year-old cast-aluminum deck collar — held by wood screws and bedded with 3M 5200 — with a custom stainless steel unit bolted through the deck with M10 bolts.▶ 0:43 The new collar carries attachment points for three reefing lines, mainsheet, main halyard, Cunningham, outhaul, and spare halyard, routing all control lines aft to the cockpit.▶ 5:26 Two aft attachment points tie to the mast via turnbuckles or tie rods so halyard loads compress the mast rather than pull up on the deck.▶ 5:56 The second upgrade is a rebuilt keel step: the original aluminum box, corroded from sitting in bilge water against bronze keel bolts, is replaced with a G10 fiberglass pedestal epoxied into the bilge, topped by a new aluminum plate elevated clear of standing water.▶ 21:07 The G10 is cut in two sections to preserve torque-wrench access to the keel bolts.▶ 25:41 Both projects required exposing and sealing deck core with epoxy before final installation.▶ 3:35 Routing lines aft to the cockpit demands a deck collar structurally tied to the mast, not just bolted to the deck.▶ 1:04

Mer fra Sailing Uma

Uma is Ready to Launch! (But there's a catch) | Step 489juni 2026How Many Sails Does it Take To Replace a Diesel Engine? | Step 488mai 2026Turning Our Powerboat Back Into a Sailboat | Step 487mai 2026We Cut our Mast in Half | Step 486mai 2026

Fra Sailing Uma – se kanalens båt, mannskap og alle analyserte videoer.

Rapporter et problem
HjemKanalerBåter

Mer

SøkSpørOmStøtt ossFor skapereLogg inn

Språk

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Visningsmodus

sailing.directory

En indeks over seilkanaler på YouTube — søkbar etter tema, navigerbar etter interesse. Nye kanaler og båter, indeksert ukentlig. Ingen støy.

Utforsk

KanalerBåterSøkOmForeslå en kanal

Skapere og juss

Støtt ossFor skaperePersonvernVilkårDMCA

Ikke navigasjonsråd · © 2026