sailing.directory
CanaisBarcosPerguntarSobre
🇧🇷
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Entrar
sailing.directory

Um índice dos canais de vela no YouTube — buscável por tema, navegável por interesse. Novos canais e barcos, indexados toda semana. Sem ruído.

Explorar

CanaisBarcosBuscarSobreSugerir um canal

Criadores e informações legais

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é um conselho de navegação · © 2026

InícioCanaisBarcos

Mais

BuscarPerguntarSobreApoiarPara criadoresEntrar

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de exibição

sailing.directory
CanaisBarcosPerguntarSobre
🇧🇷
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Entrar

Sailing Uma · vídeo

The Last Jobs Before We Step the Mast | Step 485

10 de maio de 2026 · 27 min · 110K visualizações

Assistir no YouTube

O que este vídeo aborda

Dan and Kika on Uma complete two structural upgrades required before re-stepping the mast after roughly two years of sailing without one.▶ 0:00 The first is replacing a 50-year-old cast-aluminum deck collar — held by wood screws and bedded with 3M 5200 — with a custom stainless steel unit bolted through the deck with M10 bolts.▶ 0:43 The new collar carries attachment points for three reefing lines, mainsheet, main halyard, Cunningham, outhaul, and spare halyard, routing all control lines aft to the cockpit.▶ 5:26 Two aft attachment points tie to the mast via turnbuckles or tie rods so halyard loads compress the mast rather than pull up on the deck.▶ 5:56 The second upgrade is a rebuilt keel step: the original aluminum box, corroded from sitting in bilge water against bronze keel bolts, is replaced with a G10 fiberglass pedestal epoxied into the bilge, topped by a new aluminum plate elevated clear of standing water.▶ 21:07 The G10 is cut in two sections to preserve torque-wrench access to the keel bolts.▶ 25:41 Both projects required exposing and sealing deck core with epoxy before final installation.▶ 3:35 Routing lines aft to the cockpit demands a deck collar structurally tied to the mast, not just bolted to the deck.▶ 1:04

Mais de Sailing Uma

Uma is Ready to Launch! (But there's a catch) | Step 489jun. de 2026How Many Sails Does it Take To Replace a Diesel Engine? | Step 488mai. de 2026Turning Our Powerboat Back Into a Sailboat | Step 487mai. de 2026We Cut our Mast in Half | Step 486mai. de 2026

De Sailing Uma — veja o barco, a tripulação e cada vídeo analisado do canal.

Reportar um problema
InícioCanaisBarcos

Mais

BuscarPerguntarSobreApoiarPara criadoresEntrar

Idioma

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modo de exibição

sailing.directory

Um índice dos canais de vela no YouTube — buscável por tema, navegável por interesse. Novos canais e barcos, indexados toda semana. Sem ruído.

Explorar

CanaisBarcosBuscarSobreSugerir um canal

Criadores e informações legais

ApoiarPara criadoresPrivacidadeTermosDMCA

Não é um conselho de navegação · © 2026