sailing.directory
CanaliBarcheChiediChi siamo
🇮🇹
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Accedi
sailing.directory

Un indice dei canali di vela su YouTube — consultabile per argomento, navigabile per interesse. Nuovi canali e nuove barche, indicizzati ogni settimana. Senza rumore.

Esplora

CanaliBarcheCercaChi siamoSuggerisci un canale

Creator e note legali

SostieniPer i creatorPrivacyTerminiDMCA

Non è un consiglio di navigazione · © 2026

HomeCanaliBarche

Altro

CercaChiediChi siamoSostieniPer i creatorAccedi

Lingua

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modalità di visualizzazione

sailing.directory
CanaliBarcheChiediChi siamo
🇮🇹
🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk
Accedi

Sailing Uma · video

The Last Jobs Before We Step the Mast | Step 485

10 maggio 2026 · 27 min · 110K visualizzazioni

Guarda su YouTube

Cosa tratta questo video

Dan and Kika on Uma complete two structural upgrades required before re-stepping the mast after roughly two years of sailing without one.▶ 0:00 The first is replacing a 50-year-old cast-aluminum deck collar — held by wood screws and bedded with 3M 5200 — with a custom stainless steel unit bolted through the deck with M10 bolts.▶ 0:43 The new collar carries attachment points for three reefing lines, mainsheet, main halyard, Cunningham, outhaul, and spare halyard, routing all control lines aft to the cockpit.▶ 5:26 Two aft attachment points tie to the mast via turnbuckles or tie rods so halyard loads compress the mast rather than pull up on the deck.▶ 5:56 The second upgrade is a rebuilt keel step: the original aluminum box, corroded from sitting in bilge water against bronze keel bolts, is replaced with a G10 fiberglass pedestal epoxied into the bilge, topped by a new aluminum plate elevated clear of standing water.▶ 21:07 The G10 is cut in two sections to preserve torque-wrench access to the keel bolts.▶ 25:41 Both projects required exposing and sealing deck core with epoxy before final installation.▶ 3:35 Routing lines aft to the cockpit demands a deck collar structurally tied to the mast, not just bolted to the deck.▶ 1:04

Altro da Sailing Uma

Uma is Ready to Launch! (But there's a catch) | Step 489giu 2026How Many Sails Does it Take To Replace a Diesel Engine? | Step 488mag 2026Turning Our Powerboat Back Into a Sailboat | Step 487mag 2026We Cut our Mast in Half | Step 486mag 2026

Da Sailing Uma — guarda la barca, l'equipaggio e ogni video analizzato del canale.

Segnala un problema
HomeCanaliBarche

Altro

CercaChiediChi siamoSostieniPer i creatorAccedi

Lingua

🇺🇸English🇬🇧English (UK)🇲🇽Español (México)🇪🇸Español (España)🇫🇷Français🇮🇹Italiano🇵🇹Português (Portugal)🇧🇷Português (Brasil)🇬🇷Ελληνικά🇳🇴Norsk

Modalità di visualizzazione

sailing.directory

Un indice dei canali di vela su YouTube — consultabile per argomento, navigabile per interesse. Nuovi canali e nuove barche, indicizzati ogni settimana. Senza rumore.

Esplora

CanaliBarcheCercaChi siamoSuggerisci un canale

Creator e note legali

SostieniPer i creatorPrivacyTerminiDMCA

Non è un consiglio di navigazione · © 2026