Project Brupegvideo

Building Stabiliser Arm Guides (The Sliders) - Brupeg Ep. 153

22. juni 2020 · 16 min · 32K visninger

Hva denne videoen dekker

Damien fabricates stabilizer arm guides—referred to as sliders—for a vessel conversion project by welding pressed steel components into a rigid assembly.0:03 Because the pressed steel pieces exhibit inherent warping, he constructs a simple jig using a 41mm-wide hardwood spacer to maintain precise alignment during the tack-welding process.3:18 This 41mm gap accommodates a 32mm pin and two 4.5mm high-density polyethylene (HDPE) strips on either side.4:03 To ensure full encapsulation of the pin and prevent metal-on-metal contact, he adds a third HDPE strip to the inner edge of the slider.4:32 After tacking the components, he completes the final welds.7:05 The team then positions the finished sliders on the boat’s deck to verify geometry and determine the mounting locations for stainless steel pads.13:39 The project also involves concurrent tasks, including interior cabin construction, wing painting, and organizing new crew members.14:34 Using a jig to maintain consistent spacing during welding effectively corrects the deformation caused by the initial metal pressing process.3:16

Se på YouTube

Mer fra Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463okt. 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sep. 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sep. 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sep. 2026

Fra Project Brupeg – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem