Project Brupegvidéo

Building Stabiliser Arm Guides (The Sliders) - Brupeg Ep. 153

22 juin 2020 · 16 min · 32K vues

Ce que couvre cette vidéo

Damien fabricates stabilizer arm guides—referred to as sliders—for a vessel conversion project by welding pressed steel components into a rigid assembly.0:03 Because the pressed steel pieces exhibit inherent warping, he constructs a simple jig using a 41mm-wide hardwood spacer to maintain precise alignment during the tack-welding process.3:18 This 41mm gap accommodates a 32mm pin and two 4.5mm high-density polyethylene (HDPE) strips on either side.4:03 To ensure full encapsulation of the pin and prevent metal-on-metal contact, he adds a third HDPE strip to the inner edge of the slider.4:32 After tacking the components, he completes the final welds.7:05 The team then positions the finished sliders on the boat’s deck to verify geometry and determine the mounting locations for stainless steel pads.13:39 The project also involves concurrent tasks, including interior cabin construction, wing painting, and organizing new crew members.14:34 Using a jig to maintain consistent spacing during welding effectively corrects the deformation caused by the initial metal pressing process.3:16

Regarder sur YouTube

Plus de vidéos de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463oct. 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sept. 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sept. 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sept. 2026

De Project Brupeg — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème