Land Rats on a Bartered Sailboatvideo

Getting the mast ready to put on the boat. Rigging, Ropes & More | Land Rats | EP42

16. mai 2021 · 14 min · 347 visninger · Durban

Hva denne videoen dekker

Preparation for stepping a mast at the Bluff Yacht Club in Durban, South Africa, involves inspecting standing rigging for structural integrity and replacing worn running rigging.0:19 To identify potential fatigue, the crew uses a three-part Spanjart dye penetrant system on stainless steel fittings, cleaning the metal before applying a penetrant, followed by a developer to highlight surface cracks.0:53 While some fittings show red staining, the crew attributes these marks to surface rust or minor indentations rather than structural fractures.8:02 The project also includes adjusting the spreader angle to a 6-degree bend using a protractor template and securing the rigging to the spreaders with seizing wire, which the crew sourced locally after a multi-day search.9:43 Additionally, the team reassembles the roller furling system, clearing out all spare parts except for one bolt requiring a thread tap.13:34

Se på YouTube

Mer fra Land Rats on a Bartered Sailboat

Sailing across country borders, International Sailing, South Africa to Namibia | Land Rats | EP70juli 2022Exploring Richards bay and sailing back to Durban | Land Rats | EP60okt. 2021Offshore Sailing, first passage on our Steel boat, Durban to Richards Bay | Land Rats | EP59okt. 2021Out Sailingsep. 2021

Fra Land Rats on a Bartered Sailboat – se kanalens båt, mannskap og alle analyserte videoer.

The Sailing Directory Newsletter

Én e-post med flåtens beste funn – øyeblikkene, båtene og historiene som er verdt din seertid. Skriv inn din egen adresse for å få din egen kopi.

Rapporter et problem